[{"data":1,"prerenderedAt":1487},["ShallowReactive",2],{"ticker-data":3,"story-authors/pete-tillotson":540,"stories-article-article/-content.date:desc-pete-tillotson":561},[4,52,82,112,148,186,228,259,296,328,371,412,450,481,510],{"publishedDate":5,"updateFrequency":6,"updateFrequencyText":7,"label":8,"today":9,"last":10,"percentageChange":11,"yearToDate":12,"yearOnYear":13,"oneYearIndexTrend":14,"url":48,"subscription":49,"isProtected":50,"hasAccess":51},"2026-05-27","2wk","Updated every 2 weeks","Lithium",411.01,408.51,0.61,75.85,175.57,[15,16,18,21,24,27,30,33,36,39,42,45],{"date":5,"value":9},{"date":17,"value":10},"2026-05-13",{"date":19,"value":20},"2026-04-29",372.51,{"date":22,"value":23},"2026-04-15",354.35,{"date":25,"value":26},"2026-04-01",346.55,{"date":28,"value":29},"2026-03-18",351.32,{"date":31,"value":32},"2026-03-04",346.6,{"date":34,"value":35},"2026-02-18",324,{"date":37,"value":38},"2026-02-04",337.67,{"date":40,"value":41},"2026-01-21",298.32,{"date":43,"value":44},"2026-01-07",233.73,{"date":46,"value":47},"2025-12-24",203.79,"/lithium/prices",null,false,true,{"publishedDate":5,"updateFrequency":6,"updateFrequencyText":7,"label":53,"today":54,"last":55,"percentageChange":56,"yearToDate":57,"yearOnYear":58,"oneYearIndexTrend":59,"url":48,"subscription":49,"isProtected":50,"hasAccess":51},"Lithium Carbonate",449.85,451.12,-0.28,77.12,181.56,[60,61,62,64,66,68,70,72,74,76,78,80],{"date":5,"value":54},{"date":17,"value":55},{"date":19,"value":63},404.38,{"date":22,"value":65},381.25,{"date":25,"value":67},371.52,{"date":28,"value":69},373.01,{"date":31,"value":71},366.63,{"date":34,"value":73},349.17,{"date":37,"value":75},356.81,{"date":40,"value":77},316.73,{"date":43,"value":79},253.98,{"date":46,"value":81},220.12,{"publishedDate":5,"updateFrequency":6,"updateFrequencyText":7,"label":83,"today":84,"last":85,"percentageChange":86,"yearToDate":87,"yearOnYear":88,"oneYearIndexTrend":89,"url":48,"subscription":49,"isProtected":50,"hasAccess":51},"Lithium Hydroxide",358.35,350.28,2.3,76.32,168.94,[90,91,92,94,96,98,100,102,104,106,108,110],{"date":5,"value":84},{"date":17,"value":85},{"date":19,"value":93},328.09,{"date":22,"value":95},316.95,{"date":25,"value":97},311.86,{"date":28,"value":99},321.41,{"date":31,"value":101},319.14,{"date":34,"value":103},295.42,{"date":37,"value":105},310,{"date":40,"value":107},270.4,{"date":43,"value":109},203.24,{"date":46,"value":111},177.17,{"publishedDate":19,"updateFrequency":113,"updateFrequencyText":114,"label":115,"today":116,"last":117,"percentageChange":118,"yearToDate":119,"yearOnYear":120,"oneYearIndexTrend":121,"url":147,"subscription":49,"isProtected":50,"hasAccess":51},"1wk","Updated every week","Cobalt",244.61,252.61,-3.17,3.99,97.72,[122,123,124,127,129,132,133,136,138,141,143,146],{"date":19,"value":116},{"date":25,"value":117},{"date":125,"value":126},"2026-03-25",252.45,{"date":28,"value":128},252.84,{"date":130,"value":131},"2026-03-11",253.48,{"date":31,"value":126},{"date":134,"value":135},"2026-02-25",256.64,{"date":34,"value":137},255.58,{"date":139,"value":140},"2026-02-11",253.31,{"date":37,"value":142},252.26,{"date":144,"value":145},"2026-01-28",241.15,{"date":40,"value":145},"/cobalt/prices",{"publishedDate":149,"updateFrequency":6,"updateFrequencyText":7,"label":150,"today":151,"last":152,"percentageChange":153,"yearToDate":154,"yearOnYear":155,"oneYearIndexTrend":156,"url":185,"subscription":49,"isProtected":50,"hasAccess":51},"2026-05-20","Nickel",135.83,133.05,2.09,12.5,30.68,[157,158,160,163,166,168,170,172,174,176,179,182],{"date":149,"value":151},{"date":159,"value":152},"2026-05-06",{"date":161,"value":162},"2026-04-22",125.43,{"date":164,"value":165},"2026-04-08",124.51,{"date":125,"value":167},123.94,{"date":130,"value":169},123.51,{"date":134,"value":171},122.7,{"date":139,"value":173},123.79,{"date":144,"value":175},128.07,{"date":177,"value":178},"2026-01-14",120.74,{"date":180,"value":181},"2025-12-31",104.29,{"date":183,"value":184},"2025-12-17",103.44,"/nickel/prices",{"publishedDate":187,"updateFrequency":188,"updateFrequencyText":188,"label":189,"today":190,"last":191,"percentageChange":192,"yearToDate":193,"yearOnYear":194,"oneYearIndexTrend":195,"url":227,"subscription":49,"isProtected":50,"hasAccess":51},"2026-04-30","monthly","Natural Graphite",82.93,82.39,0.66,1.66,-0.87,[196,197,199,202,205,207,210,212,215,218,221,224],{"date":187,"value":190},{"date":198,"value":191},"2026-03-31",{"date":200,"value":201},"2026-02-27",81.92,{"date":203,"value":204},"2026-01-30",81.69,{"date":180,"value":206},81.58,{"date":208,"value":209},"2025-11-28",81.35,{"date":211,"value":209},"2025-10-31",{"date":213,"value":214},"2025-09-30",81.74,{"date":216,"value":217},"2025-08-29",81.56,{"date":219,"value":220},"2025-07-31",82.47,{"date":222,"value":223},"2025-06-30",83.13,{"date":225,"value":226},"2025-05-30",83.77,"/natural-graphite/prices",{"publishedDate":187,"updateFrequency":188,"updateFrequencyText":188,"label":229,"today":230,"last":231,"percentageChange":232,"yearToDate":233,"yearOnYear":234,"oneYearIndexTrend":235,"url":258,"subscription":49,"isProtected":50,"hasAccess":51},"Anode Coke",84.01,79.79,5.29,12.86,12.75,[236,237,238,240,242,244,246,248,250,252,254,256],{"date":187,"value":230},{"date":198,"value":231},{"date":200,"value":239},75.72,{"date":203,"value":241},74.61,{"date":180,"value":243},74.44,{"date":208,"value":245},76,{"date":211,"value":247},72.75,{"date":213,"value":249},71.92,{"date":216,"value":251},71.46,{"date":219,"value":253},70.35,{"date":222,"value":255},67.35,{"date":225,"value":257},65.78,"/synthetic-graphite/prices",{"publishedDate":260,"updateFrequency":188,"updateFrequencyText":188,"label":261,"today":262,"last":263,"percentageChange":264,"yearToDate":265,"yearOnYear":265,"oneYearIndexTrend":266,"url":295,"subscription":49,"isProtected":50,"hasAccess":51},"2025-11-17","Anode",77.79,77.96,-0.22,-1.93,[267,268,270,272,274,277,280,282,284,287,290,292],{"date":260,"value":262},{"date":269,"value":263},"2025-10-15",{"date":271,"value":263},"2025-09-15",{"date":273,"value":263},"2025-08-15",{"date":275,"value":276},"2025-07-15",77.93,{"date":278,"value":279},"2025-06-16",78.88,{"date":281,"value":279},"2025-05-15",{"date":283,"value":279},"2025-04-15",{"date":285,"value":286},"2025-03-17",79.89,{"date":288,"value":289},"2025-02-17",78.97,{"date":291,"value":289},"2025-01-15",{"date":293,"value":294},"2024-12-16",79.32,"/anode/prices",{"publishedDate":297,"updateFrequency":188,"updateFrequencyText":188,"label":298,"today":299,"last":300,"percentageChange":301,"yearToDate":301,"yearOnYear":302,"oneYearIndexTrend":303,"url":327,"subscription":49,"isProtected":50,"hasAccess":51},"2026-01-15","Cathode",72.79,64.08,13.59,43.38,[304,305,307,309,311,313,315,317,318,320,322,325],{"date":297,"value":299},{"date":306,"value":300},"2025-12-15",{"date":260,"value":308},62.01,{"date":269,"value":310},53.51,{"date":271,"value":312},49.5,{"date":273,"value":314},47.28,{"date":275,"value":316},46.05,{"date":278,"value":316},{"date":281,"value":319},48.08,{"date":283,"value":321},48.92,{"date":323,"value":324},"2025-03-18",52.79,{"date":288,"value":326},50.86,"/cathode/prices",{"publishedDate":329,"updateFrequency":188,"updateFrequencyText":188,"label":330,"today":331,"last":332,"percentageChange":333,"yearToDate":334,"yearOnYear":335,"oneYearIndexTrend":336,"url":370,"subscription":49,"isProtected":50,"hasAccess":51},"2025-03-31","Lithium ion Batteries",74.53,71.3,4.53,-1.6,-20.88,[337,338,340,343,346,349,352,355,358,361,364,367],{"date":329,"value":331},{"date":339,"value":332},"2025-02-28",{"date":341,"value":342},"2025-01-31",71.45,{"date":344,"value":345},"2024-12-31",75.74,{"date":347,"value":348},"2024-11-29",76.98,{"date":350,"value":351},"2024-10-31",77.34,{"date":353,"value":354},"2024-09-30",77.43,{"date":356,"value":357},"2024-08-30",80.56,{"date":359,"value":360},"2024-07-31",82.99,{"date":362,"value":363},"2024-06-28",87.2,{"date":365,"value":366},"2024-05-31",90.7,{"date":368,"value":369},"2024-04-30",93.2,"/battery-gigafactory/prices",{"publishedDate":372,"updateFrequency":6,"updateFrequencyText":7,"label":373,"today":374,"last":375,"percentageChange":376,"yearToDate":377,"yearOnYear":378,"oneYearIndexTrend":379,"url":411,"subscription":49,"isProtected":50,"hasAccess":51},"2026-05-21","Black Mass",54.15,51.47,5.21,25.5,92.33,[380,381,383,386,389,392,395,398,401,404,406,408],{"date":372,"value":374},{"date":382,"value":375},"2026-05-07",{"date":384,"value":385},"2026-04-23",48.63,{"date":387,"value":388},"2026-04-09",48.6,{"date":390,"value":391},"2026-03-26",47.29,{"date":393,"value":394},"2026-03-12",46.18,{"date":396,"value":397},"2026-02-26",45.8,{"date":399,"value":400},"2026-02-12",47.34,{"date":402,"value":403},"2026-01-29",49.57,{"date":297,"value":405},43.15,{"date":180,"value":407},47.05,{"date":409,"value":410},"2025-12-18",41.51,"/recycling/black-mass-prices",{"publishedDate":413,"updateFrequency":188,"updateFrequencyText":188,"label":414,"today":415,"last":416,"percentageChange":417,"yearToDate":418,"yearOnYear":419,"oneYearIndexTrend":420,"url":449,"subscription":49,"isProtected":50,"hasAccess":51},"2026-03-19","Rare Earths",172.27,182.38,-5.54,20.73,54.49,[421,422,424,427,430,432,435,437,440,443,445,447],{"date":413,"value":415},{"date":423,"value":416},"2026-03-05",{"date":425,"value":426},"2026-02-19",179.86,{"date":428,"value":429},"2026-02-05",155.4,{"date":431,"value":429},"2026-01-22",{"date":433,"value":434},"2026-01-08",145.37,{"date":46,"value":436},142.69,{"date":438,"value":439},"2025-12-11",141.67,{"date":441,"value":442},"2025-11-27",136.29,{"date":211,"value":444},132.15,{"date":213,"value":446},139.82,{"date":216,"value":448},145.27,"/rare-earths/prices",{"publishedDate":213,"updateFrequency":188,"updateFrequencyText":188,"label":451,"today":452,"last":453,"percentageChange":454,"yearToDate":455,"yearOnYear":456,"oneYearIndexTrend":457,"url":370,"subscription":49,"isProtected":50,"hasAccess":51},"LFP",111.93,124.92,-10.4,-2.67,-3.42,[458,459,460,462,464,466,469,471,473,475,477,479],{"date":213,"value":452},{"date":216,"value":453},{"date":219,"value":461},109.9,{"date":222,"value":463},100.47,{"date":225,"value":465},103.62,{"date":467,"value":468},"2025-04-30",109.47,{"date":329,"value":470},115.87,{"date":339,"value":472},117.3,{"date":341,"value":474},114.57,{"date":344,"value":476},115,{"date":347,"value":478},117.82,{"date":350,"value":480},111.9,{"publishedDate":213,"updateFrequency":188,"updateFrequencyText":188,"label":482,"today":483,"last":484,"percentageChange":485,"yearToDate":486,"yearOnYear":487,"oneYearIndexTrend":488,"url":370,"subscription":49,"isProtected":50,"hasAccess":51},"NCM High-Nickel",99.44,96.91,2.61,2.37,-3.84,[489,490,491,493,495,497,499,501,503,505,506,508],{"date":213,"value":483},{"date":216,"value":484},{"date":219,"value":492},97.09,{"date":222,"value":494},94.93,{"date":225,"value":496},97.13,{"date":467,"value":498},97.89,{"date":329,"value":500},101.4,{"date":339,"value":502},93.25,{"date":341,"value":504},98.94,{"date":344,"value":496},{"date":347,"value":507},98.69,{"date":350,"value":509},101.87,{"publishedDate":213,"updateFrequency":188,"updateFrequencyText":188,"label":511,"today":512,"last":513,"percentageChange":514,"yearToDate":515,"yearOnYear":516,"oneYearIndexTrend":517,"url":370,"subscription":49,"isProtected":50,"hasAccess":51},"NCM Mid-Nickel",103.5,99.73,3.78,13.78,6.78,[518,519,520,522,524,526,528,530,532,534,536,538],{"date":213,"value":512},{"date":216,"value":513},{"date":219,"value":521},99.19,{"date":222,"value":523},96.02,{"date":225,"value":525},98.23,{"date":467,"value":527},99.24,{"date":329,"value":529},101.29,{"date":339,"value":531},87.61,{"date":341,"value":533},92.44,{"date":344,"value":535},90.96,{"date":347,"value":537},92.24,{"date":350,"value":539},95.09,{"id":541,"uuid":542,"name":543,"slug":544,"full_slug":545,"content":546,"relatedArticles":559,"relatedVideos":560},153750125964737,"092245d7-8798-4c34-80a6-52cf283f6a5c","Pete Tillotson","pete-tillotson","authors/pete-tillotson",{"x":547,"bio":548,"_uid":549,"email":547,"image":550,"linkedin":555,"component":556,"job_title":557,"markets_covered":558,"certification_name":547,"certification_recoginition":547,"certification_recoginition_url":547,"formattedDate":547,"formattedArticleDate":547},"","Pete is a Senior Analyst on the downstream team covering the ex-China BESS markets. He works closely on the BESS monthly analysis and reporting as well as the BESS Quarterly Outlook. Pete holds an MSc from Imperial College London in Environmental Technology and a BA in Politics from the University of Exeter.","05c91881-6116-49c3-a866-21cf4ccea50f",{"id":551,"alt":547,"name":547,"focus":547,"title":547,"source":547,"filename":552,"copyright":547,"fieldtype":553,"meta_data":554,"is_external_url":50},153750476274910,"https://a.storyblok.com/f/287943243085208/800x800/bfcfbe219a/pete-tilloston.jpeg","asset",{},"https://www.linkedin.com/in/pete-tillotson-b09495158/","author","Senior Analyst - BESS","BESS",[],[],[562,725,920,1047,1168,1305],{"id":563,"uuid":564,"name":565,"slug":566,"full_slug":567,"content":568},200780451609525,"37961f6c-f52a-4ebd-aa4e-7e6681fc8973","Google to purchase 100% of output from the US’s largest under-construction BESS","google-to-purchase-all-power-from-largest-under-construction-bess-project-in-us","article/google-to-purchase-all-power-from-largest-under-construction-bess-project-in-us",{"_uid":569,"date":570,"tags":571,"editor":587,"content":597,"excerpt":705,"featured":51,"reporter":706,"component":710,"seo_title":711,"categories":712,"visibility":716,"data_vis_image":717,"featured_image":719,"seo_description":723,"formattedDate":724},"4a65611f-f67f-4c93-ba6a-04806609a973","2026-07-22 00:00",[572,575,578,581,584],{"slug":573,"name":574},"data-centres","Data centres",{"slug":576,"name":577},"google","Google",{"slug":579,"name":580},"cypress-creek-energy","Cypress Creek Energy",{"slug":582,"name":583},"entergy","Entergy",{"slug":585,"name":586},"grid","Grid",[588],{"slug":589,"name":590,"content":591},"benjamin-roche","Benjamin Roche",{"job_title":592,"image":593,"bio":595,"linkedin":596},"Editor – Energy Transition Supply Chains",{"filename":594},"https://a.storyblok.com/f/287943243085208/800x800/66d6674fb8/benjamin-roche.png","Benjamin is Benchmark's Editor for Energy Transition Supply Chains, covering both upstream products like critical minerals and downstream products including energy storage systems and electric vehicles. He has previous experience covering trade flows, tariffs and the effects of geopolitics on supply chains.","https://www.linkedin.com/in/benjaminrochecontent/",{"type":598,"content":599},"doc",[600,619,633,647,652,662,675,680,685],{"type":601,"attrs":602,"content":603},"paragraph",{"textAlign":49},[604,607,617],{"text":605,"type":606},"Google has announced it will purchase all the power generated from the first two phases of Cypress Creek's ","text",{"text":608,"type":606,"marks":609},"Steel River Energy Center",[610],{"type":611,"attrs":612},"link",{"href":613,"uuid":614,"anchor":49,"target":615,"linktype":616},"/publications/briefings/energy-indicators/energy-indicators-monthly-july-2026","bbb1e698-8010-4fa2-a283-a47f9d298eb5","_blank","story",{"text":618,"type":606}," in Arkansas. The project comprises 1.6GW of solar paired with 1.9GWh of battery storage, with a potential third phase raising storage to 2.9GWh by 2029.",{"type":601,"attrs":620,"content":621},{"textAlign":49},[622,624,631],{"text":623,"type":606},"Power will flow to the grid via the utility Entergy Arkansas rather than directly to Google's facilities, offsetting load from existing and planned ",{"text":625,"type":606,"marks":626},"data centres",[627],{"type":611,"attrs":628},{"href":629,"uuid":630,"anchor":49,"target":615,"linktype":616},"/article/nextera-acquires-dominion-energy-as-us-data-centre-demand-drives-energy-storage-growth","213c7915-b6a1-48e4-9d82-9a263f102c25",{"text":632,"type":606}," nearby whilst serving Google’s clean power procurement needs via the power purchase agreement (PPA).",{"type":601,"attrs":634,"content":635},{"textAlign":49},[636,638,645],{"text":637,"type":606},"This deal demonstrates how ",{"text":639,"type":606,"marks":640},"data centre energy demand",[641],{"type":611,"attrs":642},{"href":643,"uuid":644,"anchor":49,"target":615,"linktype":616},"/article/us-solar-firm-nextpower-enters-energy-storage-market-through-acquisition-of-bess-maker-prevalon","b82f9e82-264c-4364-907f-b0e8181b2433",{"text":646,"type":606}," can drive renewable deployment. By securing clean energy offtakes at scale, gigawatts of power and storage can be quickly connected to grids to keep up with data centre power demands. It does, however, raise questions about whether these builds meaningfully firm grid reliability broadly or primarily serve corporate decarbonisation commitments.",{"type":601,"attrs":648,"content":649},{"textAlign":49},[650],{"text":651,"type":606},"“While hyperscalers have historically looked to gas to power new load additions, renewable PPAs such as this demonstrate the relevance of clean power to the incoming wave of data centre capacity,\" said Pete Tillotson, a senior BESS analyst at Benchmark.",{"type":653,"attrs":654},"blok",{"id":655,"body":656},"f69e6a32-92f4-459f-a45a-34bfc9e28029",[657],{"id":658,"_uid":659,"type":660,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"29410342","i-28b2a0f2-6787-4cbe-9597-d7353e82f611","visualisation","ContentFlourish",{"type":663,"attrs":664,"content":666},"heading",{"level":665,"textAlign":49},2,[667],{"text":668,"type":606,"marks":669},"Deployment speed advantage amid AI demand growth",[670,673],{"type":671,"attrs":672},"textStyle",{"color":547},{"type":674},"bold",{"type":601,"attrs":676,"content":677},{"textAlign":49},[678],{"text":679,"type":606},"Battery energy stationary storage (BESS) eases interconnection for large, inflexible new loads and is materially faster to deploy than gas peakers, nuclear, or transmission upgrades. This is a significant advantage given the pace of AI-driven demand growth, which is perhaps reflected in the US$3.5 billion in project financing underwritten by Barclays, BNP Paribas, Santander, and Wells Fargo. Their commitment demonstrates continued lender appetite for storage paired with solar despite the loss of federal tax credits and tariff volatility.",{"type":601,"attrs":681,"content":682},{"textAlign":49},[683],{"text":684,"type":606},"Of the 29 grid-scale energy projects in the US relating to data centres being tracked by Benchmark to date, Steel River is the third largest in the pipeline, with Sunstone Solar & Storage project in Oregon (~7.2GWh) and Pine Island data centre BESS in Minnesota (30GWh) being larger by energy storage capacity.",{"type":601,"attrs":686,"content":687},{"textAlign":49},[688,693,701],{"text":689,"type":606,"marks":690},"Benchmark recently published a Special Issue covering data centres and their impact on BESS and critical minerals: ",[691],{"type":692},"italic",{"text":694,"type":606,"marks":695},"Gigawatt Ambitions: Data Centres, BESS, and the Race to Power",[696,700],{"type":611,"attrs":697},{"href":698,"uuid":49,"anchor":49,"target":615,"linktype":699},"https://source.benchmarkminerals.com/publications/special-issues/gigawatt-ambitions-data-centres-bess-and-the-race-to-power","url",{"type":692},{"text":702,"type":606,"marks":703},".",[704],{"type":692},"Google has announced it will purchase all the power generated from the first two phases of Cypress Creek's Steel River Energy Center in Arkansas. The project comprises 1.6GW of solar paired with 1.9GWh of battery storage, with a potential third phase raising storage to 2.9GWh by 2029.\n\nPower will flow to the grid via the utility Entergy Arkansas rather than directly to Google's facilities, offsetting load from existing and planned data centres nearby whilst serving Google’s clean power procurement needs via the power purchase agreement (PPA).",[707],{"slug":544,"name":543,"content":708},{"job_title":557,"image":709,"bio":548,"linkedin":555,"markets_covered":558},{"filename":552},"article","Google to buy all output from largest US BESS under construction",[713],{"slug":714,"name":715},"ess","ESS","public",{"id":49,"alt":49,"name":547,"focus":49,"title":49,"source":49,"filename":547,"copyright":49,"fieldtype":553,"meta_data":718},{},{"id":720,"alt":547,"name":547,"focus":547,"title":547,"source":547,"filename":721,"copyright":547,"fieldtype":553,"meta_data":722,"is_external_url":50},200808387786314,"https://a.storyblok.com/f/287943243085208/3500x2625/940226a2ca/new-albany-data-center-campus-in-central-ohio-coolant-distribution-units.jpg",{},"Google has announced it will purchase all the power generated from the first two phases of Cypress Creek's Steel River Energy Center in Arkansas. The project comprises 1.6GW of solar paired with 1.9GWh of battery storage.","Jul 22, 2026",{"id":726,"uuid":727,"name":728,"slug":729,"full_slug":730,"content":731},184216704050300,"3e888653-ccc0-48d2-89aa-6b0b4e35e911","Benchmark battery energy stationary storage database surpasses 10,000 projects","benchmark-battery-energy-stationary-storage-database-surpasses-10000-projects","article/benchmark-battery-energy-stationary-storage-database-surpasses-10000-projects",{"_uid":732,"date":733,"tags":734,"editor":747,"content":757,"excerpt":889,"featured":51,"reporter":890,"component":710,"seo_title":904,"categories":905,"visibility":716,"data_vis_image":910,"featured_image":914,"seo_description":918,"formattedDate":919},"0cab84f2-1ff6-49f0-9e80-9bd9013323a9","2026-06-05 00:00",[735,738,741,744],{"slug":736,"name":737},"data-visualisation","Data Visualisation",{"slug":739,"name":740},"china","China",{"slug":742,"name":743},"north-america","North America",{"slug":745,"name":746},"europe","Europe",[748],{"slug":749,"name":750,"content":751},"matthew-bird","Matthew Bird",{"job_title":752,"image":753,"bio":755,"linkedin":756},"Senior Editor - Supply Chains & Data Visualisation",{"filename":754},"https://a.storyblok.com/f/287943243085208/512x512/14738033ec/matthew-bird.jpeg","Matthew writes, edits and produces content for Benchmark Intelligence and Benchmark Source across the whole mine to grid supply chain. He also acts as a liaison to the press. He has a PhD in electrochemistry from the University of Nottingham.","https://www.linkedin.com/in/birdmatthew/",{"type":598,"content":758},[759,783,814,819,826,831,836,842,847,861,867,876],{"type":601,"attrs":760,"content":761},{"textAlign":49},[762,764,772,774,781],{"text":763,"type":606},"The ",{"text":765,"type":606,"marks":766},"battery energy stationary storage",[767],{"type":611,"attrs":768},{"href":769,"uuid":770,"anchor":49,"target":771,"linktype":616},"/article/the-top-energy-storage-cell-suppliers-and-system-integrators-in-2025","dd7b0985-5771-4a9e-b68e-7060e85efa48","_self",{"text":773,"type":606}," (BESS) market has grown significantly over the last five years, with this growth is set to continue. Benchmark’s BESS database has now surpassed 10,000 unique projects, both ",{"text":775,"type":606,"marks":776},"operating",[777],{"type":611,"attrs":778},{"href":779,"uuid":780,"anchor":49,"target":771,"linktype":616},"/article/europe-has-record-quarter-for-energy-storage","acf89f40-3be3-4aef-8011-2f0d5bce1a88",{"text":782,"type":606}," and in the pipeline.",{"type":601,"attrs":784,"content":785},{"textAlign":49},[786,788,794,796,803,805,812],{"text":787,"type":606},"This is nearly nine times the number of projects Benchmark tracked in the May 2022 edition of ",{"text":789,"type":606,"marks":790},"Benchmark's BESS database",[791],{"type":611,"attrs":792},{"href":793,"uuid":49,"anchor":49,"target":771,"linktype":699},"https://www.benchmarkminerals.com/battery-energy-stationary-storage",{"text":795,"type":606},". The ",{"text":797,"type":606,"marks":798},"average size of the projects",[799],{"type":611,"attrs":800},{"href":801,"uuid":802,"anchor":49,"target":771,"linktype":616},"/article/is-the-energy-storage-market-shifting-to-longer-duration-capacities-","6c350409-abcd-42f5-a9a4-15e7729cd431",{"text":804,"type":606}," in the database has ",{"text":806,"type":606,"marks":807},"increased significantly",[808],{"type":611,"attrs":809},{"href":810,"uuid":811,"anchor":49,"target":771,"linktype":616},"/article/form-energy-announces-largest-capacity-energy-storage-system-to-date","0ff0e0c5-d9dd-4f8c-9b1b-4aa57cb0e0b4",{"text":813,"type":606},", too, from 193MWh in 2022 to 316MWh today.",{"type":601,"attrs":815,"content":816},{"textAlign":49},[817],{"text":818,"type":606},"“BESS has matured at a dramatic pace over the last five years from a relatively niche technology to the go-to source of much needed flexibility on today's grids,” said Pete Tillotson, a BESS research analyst at Benchmark. “Technological innovation, falling battery costs, intense OEM competition for market share, and the increasing realisation of its multiple benefits and speed of deployment have all contributed to BESS becoming core grid infrastructure.”",{"type":653,"attrs":820},{"id":821,"body":822},"4bce6fab-52b3-4721-b997-57344cdc9282",[823],{"id":824,"_uid":825,"type":660,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"29263694","i-81a6bf72-8942-4546-8197-1db8f9eb7617",{"type":663,"attrs":827,"content":828},{"level":665,"textAlign":49},[829],{"text":830,"type":606},"What are the trends in the database?",{"type":601,"attrs":832,"content":833},{"textAlign":49},[834],{"text":835,"type":606},"Click through this interactive data story to reveal what sorts of projects make up the database and where they are.",{"type":653,"attrs":837},{"id":821,"body":838},[839],{"id":840,"_uid":841,"type":616,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"3698199","i-31a3b391-4b87-4793-9c45-668aec3feee4",{"type":663,"attrs":843,"content":844},{"level":665,"textAlign":49},[845],{"text":846,"type":606},"How has the BESS market changed over the past five years?",{"type":601,"attrs":848,"content":849},{"textAlign":49},[850,852,859],{"text":851,"type":606},"The BESS market has grown significantly over the last five years, with a~15-times increase in annual ",{"text":853,"type":606,"marks":854},"grid-scale",[855],{"type":611,"attrs":856},{"href":857,"uuid":858,"anchor":49,"target":771,"linktype":616},"/article/china-introduces-national-capacity-pricing-for-gridside-ess-","cf6f633d-0990-45e9-b405-0feefc7463f1",{"text":860,"type":606}," installations 2021 and 2025. The average size of the projects installed since 2021 has also been increasing. The average grid-scale project in 2025 was 261MWh compared to 68MWh in 2021.",{"type":653,"attrs":862},{"id":821,"body":863},[864],{"id":865,"_uid":866,"type":660,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"29253869","i-a9a8098c-7bca-45fe-8a5d-9ad4d72cc903",{"type":601,"attrs":868,"content":869},{"textAlign":49},[870],{"text":871,"type":606,"marks":872},"This insight draws from Benchmark's granular BESS Service, consisting of detailed forecasts to 2040, system pricing, capacity growth trends and more. By bringing clarity to a rapidly accelerating market, this subscription facilitates smarter investment decisions, strategy planning and execution, and successful commercial outcomes. To learn more, submit your details below and our team will be in touch:",[873,875],{"type":671,"attrs":874},{"color":547},{"type":692},{"type":653,"attrs":877},{"id":878,"body":879},"b4f30120-3b86-4f8c-a38b-cb4c1565a288",[880],{"id":881,"_uid":882,"component":883,"wrap_in_box":50,"redirect_url":884,"success_file":886,"default_height":547,"success_message":547,"v2_hubspot_form":50,"success_sub_text":547,"hidden_field_values":888,"show_on_intelligence":50},"57a99950-73f5-48be-98a4-7324c28e5d0b","i-dcc9d729-77dc-4d24-a120-5cded55104a0","ContentHubspotForm",{"id":547,"url":547,"linktype":616,"fieldtype":885,"cached_url":547},"multilink",{"id":49,"alt":49,"name":547,"focus":49,"title":49,"source":49,"filename":547,"copyright":49,"fieldtype":553,"meta_data":887},{},[],"The battery energy stationary storage (BESS) market has grown significantly over the last five years, with this growth is set to continue. Benchmark’s BESS database has now surpassed 10,000 unique projects, both operating and in the pipeline.\n\nThis is nearly nine times the number of projects Benchmark tracked in the May 2022 edition of the BESS database. The average size of the projects in the database has increased significantly, too, from 193MWh in 2022 to 316MWh today.",[891,901],{"slug":892,"name":893,"content":894},"iola-hughes","Iola Hughes",{"job_title":895,"image":896,"bio":898,"linkedin":899,"markets_covered":900},"Head of Research",{"filename":897},"https://a.storyblok.com/f/287943243085208/852x854/03382be015/iola-h.png","Iola was Head of Research at Rho Motion prior to the acquisition, and now leads the downstream research for the Benchmark. She has six years of experience in the battery space and works across electric vehicle, battery, and energy storage markets. Previous experience includes a research position with a Servomex working on paramagnetic sensors and spectroscopy gas analysis. Iola graduated with a First-Class Honours Master’s Degree in Geophysics from University College London","https://www.linkedin.com/in/iolahughes/","Battery, BESS, EV and Battery",{"slug":544,"name":543,"content":902},{"job_title":557,"image":903,"bio":548,"linkedin":555,"markets_covered":558},{"filename":552},"Benchmark BESS database surpasses 10,000 projects",[906,907],{"slug":714,"name":715},{"slug":908,"name":909},"batteries","Batteries",{"id":911,"alt":547,"name":547,"focus":547,"title":547,"source":547,"filename":912,"copyright":547,"fieldtype":553,"meta_data":913,"is_external_url":50},184218836560728,"https://a.storyblok.com/f/287943243085208/1588x1840/c17cadeb60/10k-bess-by-region-2x.png",{},{"id":915,"alt":547,"name":547,"focus":547,"title":547,"source":547,"filename":916,"copyright":547,"fieldtype":553,"meta_data":917,"is_external_url":50},184216876272376,"https://a.storyblok.com/f/287943243085208/1600x1066/78896c6174/2026-01-29-rwe-errichtet-am-kraftwerkstandort-in-lingen-batteriespeicher-mit-400-megawatt-leistung.jpg",{},"The battery energy stationary storage (BESS) market has grown significantly over the last five years, with this growth is set to continue. Benchmark’s BESS database has now surpassed 10,000 unique projects, both operating and in the pipeline.","Jun 05, 2026",{"id":921,"uuid":644,"name":922,"slug":923,"full_slug":924,"content":925},183171680546453,"US solar firm Nextpower enters energy storage market through acquisition of BESS maker Prevalon","us-solar-firm-nextpower-enters-energy-storage-market-through-acquisition-of-bess-maker-prevalon","article/us-solar-firm-nextpower-enters-energy-storage-market-through-acquisition-of-bess-maker-prevalon",{"_uid":926,"date":927,"tags":928,"editor":937,"content":941,"excerpt":1028,"featured":51,"reporter":1029,"component":710,"seo_title":1033,"categories":1034,"visibility":1036,"data_vis_image":1037,"featured_image":1041,"seo_description":1045,"formattedDate":1046},"5d720beb-e377-453f-abc4-1f2f003d5e01","2026-06-02 00:00",[929,932,933,936],{"slug":930,"name":931},"solar-pv","Solar PV",{"slug":573,"name":574},{"slug":934,"name":935},"nextpower","Nextpower",{"slug":736,"name":737},[938],{"slug":589,"name":590,"content":939},{"job_title":592,"image":940,"bio":595,"linkedin":596},{"filename":594},{"type":598,"content":942},[943,954,959,966,994,1001,1008,1022],{"type":601,"attrs":944,"content":945},{"textAlign":49},[946,948,952],{"text":947,"type":606},"Prevalon Energy, a US-headquartered ",{"text":765,"type":606,"marks":949},[950],{"type":611,"attrs":951},{"href":769,"uuid":770,"anchor":49,"target":615,"linktype":616},{"text":953,"type":606}," (BESS) manufacturer, has been acquired by solar and energy project software integration company Nextpower for US$365 million. Nextpower offers energy management systems as well as hardware for solar energy projects, and with this acquisition is looking to gain market share in the solar-plus-storage co-location market.",{"type":601,"attrs":955,"content":956},{"textAlign":49},[957],{"text":958,"type":606},"Prevalon was formed in 2024 as part of a joint venture between Mitsubishi Power and EES, although Mitsubishi has been in the energy storage market since the early 2010s. It currently has 6.4GWh of energy storage deployed, predominantly in the US, Chile, the UK and Japan.",{"type":663,"attrs":960,"content":961},{"level":665,"textAlign":49},[962],{"text":963,"type":606,"marks":964},"Refocusing on data centre demand",[965],{"type":674},{"type":601,"attrs":967,"content":968},{"textAlign":49},[969,971,978,980,986,988,993],{"text":970,"type":606},"Nextpower aims to capitalise on the growth in ",{"text":972,"type":606,"marks":973},"AI data centre (AIDC)-related power demand growth",[974],{"type":611,"attrs":975},{"href":976,"uuid":977,"anchor":49,"target":615,"linktype":616},"/videos/behind-the-ai-boom-how-data-centre-demand-is-reshaping-bess-lithium-lfp-and-copper-markets","1573e0e7-8137-439e-b583-f703c3136f5e",{"text":979,"type":606}," through Prevalon’s data-centre specific products, designed around the management of the unique power load demands of the segment. The acquisition expands Nextpower’s role to that of a more fully integrated solar and storage system and software provider, and comes after it acquired Zigor Corporation's US power conversion business and its US subsidiary, Apex Power, as noted in ",{"text":981,"type":606,"marks":982},"Benchmark's Energy Transition Capital Briefing",[983],{"type":611,"attrs":984},{"href":985,"uuid":49,"anchor":49,"target":615,"linktype":699},"https://intelligence.benchmarkminerals.com/publications/briefings/energy-transition-capitals/energy-transition-capital-may-2026",{"text":987,"type":606},". It also follows the announcement of solar and storage developer NextEra Energy Resources’ ",{"text":989,"type":606,"marks":990},"acquisition of energy firm Dominion Energy",[991],{"type":611,"attrs":992},{"href":629,"uuid":630,"anchor":49,"target":615,"linktype":616},{"text":702,"type":606},{"type":653,"attrs":995},{"id":996,"body":997},"255cd999-b187-4bf7-b5b9-4fbf0e73c6e8",[998],{"id":999,"_uid":1000,"type":660,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"29218338","i-84f694ae-05e2-4496-afa2-86d972765542",{"type":663,"attrs":1002,"content":1003},{"level":665,"textAlign":49},[1004],{"text":1005,"type":606,"marks":1006},"Equity offers additional window into energy storage market",[1007],{"type":674},{"type":601,"attrs":1009,"content":1010},{"textAlign":49},[1011,1013,1020],{"text":1012,"type":606},"With the acquisition of Prevalon, Nextpower's stock will now reflect not only renewable power growth but also energy storage and AIDC market demand in the US, which is experiencing the largest BESS demand ",{"text":1014,"type":606,"marks":1015},"growth outside of China",[1016],{"type":611,"attrs":1017},{"href":1018,"uuid":1019,"anchor":49,"target":615,"linktype":616},"/article/us-ev-demand-shift-and-bess-growth-who-deployed-the-most-batteries-in-2025-","efc32e74-520d-4632-b92b-53006fecdeef",{"text":1021,"type":606},". Most BESS integrators are private or direct subsidiaries, but this merger provides a clear valuation on a domestic US-headquartered BESS integrator. The transaction is expected to close in 2027, with Nextpower having already improved its financial outlook for that year from $3.8 billion to $4.1 billion to $4.0 billion to $4.4 billion.",{"type":653,"attrs":1023},{"id":996,"body":1024},[1025],{"id":1026,"_uid":1027,"type":660,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"29218726","i-c82aeeed-d55a-4350-89af-bf201318e58a","Prevalon Energy, a US-headquartered battery energy stationary storage (BESS) manufacturer, has been acquired by solar and energy project software integration company Nextpower for US$365 million. Nextpower offers energy management systems as well as hardware for solar energy projects, and with this acquisition is looking to gain market share in the solar-plus-storage co-location market.\n\nPrevalon was formed in 2024 as part of a joint venture between Mitsubishi Power and EES, although Mitsubishi has been in the energy storage market since the early 2010s. It currently has 6.4GWh of energy storage deployed, predominantly in the US, Chile, the UK and Japan.",[1030],{"slug":544,"name":543,"content":1031},{"job_title":557,"image":1032,"bio":548,"linkedin":555,"markets_covered":558},{"filename":552},"Nextpower acquires Prevalon to tap into US BESS demand",[1035],{"slug":714,"name":715},"private",{"id":1038,"alt":547,"name":547,"focus":547,"title":547,"source":547,"filename":1039,"copyright":547,"fieldtype":553,"meta_data":1040,"is_external_url":50},183183657395440,"https://a.storyblok.com/f/287943243085208/716x686/95d6586594/screenshot-2026-06-02-155533.png",{},{"id":1042,"alt":547,"name":547,"focus":547,"title":547,"source":547,"filename":1043,"copyright":547,"fieldtype":553,"meta_data":1044,"is_external_url":50},183184240477552,"https://a.storyblok.com/f/287943243085208/1000x558/bfe76c50e0/prevalon.jpg",{},"Prevalon Energy, a US-headquartered battery energy stationary storage (BESS) manufacturer, has been acquired by solar and energy project software integration company Nextpower for US$365 million.","Jun 02, 2026",{"id":1048,"uuid":630,"name":1049,"slug":1050,"full_slug":1051,"content":1052},178880472166960,"NextEra acquires Dominion Energy as US data centre demand drives energy storage growth","nextera-acquires-dominion-energy-as-us-data-centre-demand-drives-energy-storage-growth","article/nextera-acquires-dominion-energy-as-us-data-centre-demand-drives-energy-storage-growth",{"_uid":1053,"date":1054,"tags":1055,"editor":1070,"content":1074,"excerpt":1150,"featured":51,"reporter":1151,"component":710,"seo_title":1155,"categories":1156,"visibility":1036,"data_vis_image":1158,"featured_image":1162,"seo_description":1166,"formattedDate":1167},"b46171fc-a5ee-4263-a80a-897675c7459e","2026-05-21 00:00",[1056,1057,1059,1062,1065,1068,1069],{"slug":930,"name":931},{"slug":1058,"name":558},"bess",{"slug":1060,"name":1061},"usa","USA",{"slug":1063,"name":1064},"nextera-energy","NextEra Energy",{"slug":1066,"name":1067},"dominion-energy","Dominion Energy",{"slug":736,"name":737},{"slug":573,"name":574},[1071],{"slug":589,"name":590,"content":1072},{"job_title":592,"image":1073,"bio":595,"linkedin":596},{"filename":594},{"type":598,"content":1075},[1076,1088,1109,1116,1121,1126,1133,1140,1145],{"type":601,"attrs":1077,"content":1078},{"textAlign":49},[1079,1081,1086],{"text":1080,"type":606},"Northern Virginia is undergoing one of the biggest current infrastructure buildouts in the US as part of its ",{"text":1082,"type":606,"marks":1083},"data centre market expansion",[1084],{"type":611,"attrs":1085},{"href":976,"uuid":977,"anchor":49,"target":615,"linktype":616},{"text":1087,"type":606},". Dominion Energy, an energy company and electricity supplier to several northeastern states headquartered in Virginia, grew its contracted data centre capacity to 51GW, up 2.5GW since Q4 2025 and three times the capacity contracted as of July 2023.",{"type":601,"attrs":1089,"content":1090},{"textAlign":49},[1091,1093,1100,1102,1107],{"text":1092,"type":606},"NextEra Energy Resources (NEER), one of the US’ largest solar and storage developers, announced on Monday 18 May that it would be acquiring Dominion Energy for USD $67 billion. The deal marks the creation of the largest regulated utility business in the world as NEER looks to capitalise on the ",{"text":1094,"type":606,"marks":1095},"demand growth",[1096],{"type":611,"attrs":1097},{"href":1098,"uuid":1099,"anchor":49,"target":615,"linktype":616},"/article/how-will-data-centres-impact-battery-demand","1f783034-b9c3-4346-b325-577419c8d493",{"text":1101,"type":606}," for ",{"text":1103,"type":606,"marks":1104},"battery energy stationary storage (BESS)",[1105],{"type":611,"attrs":1106},{"href":769,"uuid":770,"anchor":49,"target":615,"linktype":616},{"text":1108,"type":606}," and solar projects in Virginia.",{"type":663,"attrs":1110,"content":1111},{"level":665,"textAlign":49},[1112],{"text":1113,"type":606,"marks":1114},"Gap in Virginia’s market for solar plus storage markets",[1115],{"type":674},{"type":601,"attrs":1117,"content":1118},{"textAlign":49},[1119],{"text":1120,"type":606},"With a wide portfolio of energy generation assets, including 12GW+ of storage development as tracked by Benchmark, NEER has extensive expertise to further Virginia’s energy transition. NEER has experience developing and installing large-capacity generation and flexible service assets with nearly half (5.5GW) of its ESS portfolio being solar-paired BESS.",{"type":601,"attrs":1122,"content":1123},{"textAlign":49},[1124],{"text":1125,"type":606},"Conversely, storage has not been a core part of Dominion Energy’s strategy. As of January 2026, the company had 683MW of storage capacity in operation and development, compared with over 11GW of renewable generation deployments throughout the state of Virginia. Given the acquisition, this portfolio split could become more diversified in line with NEER’s expertise in co-located solar + storage projects.",{"type":653,"attrs":1127},{"id":1128,"body":1129},"7a3fc735-da14-46da-8932-0260366a9ed3",[1130],{"id":1131,"_uid":1132,"type":660,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"29056461","i-82b97883-fc77-4efd-a2fa-3fdede715ebb",{"type":663,"attrs":1134,"content":1135},{"level":665,"textAlign":49},[1136],{"text":1137,"type":606,"marks":1138},"Legislative impetus for BESS rollout",[1139],{"type":674},{"type":601,"attrs":1141,"content":1142},{"textAlign":49},[1143],{"text":1144,"type":606},"Virginia has recently made a legislative push to mandate Dominion Energy and Appalachian Power to deploy over 20GW of energy storage across short- and long-term durations. In light of Virginia’s growing AI data centre (AIDC)-related energy demand and its public policy direction, NEER’s acquisition appears to be a bid to gain market share in the growing energy storage market in Virginia.",{"type":601,"attrs":1146,"content":1147},{"textAlign":49},[1148],{"text":1149,"type":606},"The exact type of projects to come out of the partnership are yet to be seen, though it is possible that, as well as grid-side BESS, there may be deployments made in partnership with AIDC companies and hyperscalers to deploy batteries behind-the-meter (BTM) on-site at these new data centre facilities.","Northern Virginia is undergoing one of the biggest current infrastructure buildouts in the US as part of its data centre market expansion. Dominion Energy, an energy company and electricity supplier to several northeastern states headquartered in Virginia, grew its contracted data centre capacity to 51GW, up 2.5GW since Q4 2025 and three times the capacity contracted as of July 2023.",[1152],{"slug":544,"name":543,"content":1153},{"job_title":557,"image":1154,"bio":548,"linkedin":555,"markets_covered":558},{"filename":552},"NextEra acquires Dominion as data centre demand drives ESS growth",[1157],{"slug":714,"name":715},{"id":1159,"alt":547,"name":547,"focus":547,"title":547,"source":547,"filename":1160,"copyright":547,"fieldtype":553,"meta_data":1161,"is_external_url":50},178884628426376,"https://a.storyblok.com/f/287943243085208/794x676/0b21703d77/screenshot-2026-05-21-122316.png",{},{"id":1163,"alt":547,"name":547,"focus":547,"title":547,"source":547,"filename":1164,"copyright":547,"fieldtype":553,"meta_data":1165,"is_external_url":50},178881175293394,"https://a.storyblok.com/f/287943243085208/3063x2042/7a96951fd6/manatee-energy-storage-center-in-parrish-florida-photo-by-doug-murray-for-fpl-rainbow.JPG",{},"NextEra Energy Resources' $67 billion acquisition of Dominion is a bid to capitalise on the data centre-driven demand growth for battery energy stationary storage (BESS) and solar projects in the US.","May 21, 2026",{"id":1169,"uuid":1170,"name":1171,"slug":1172,"full_slug":1173,"content":1174},158396287413295,"c9e36cab-5f2c-4a05-9341-1aad24c0277d","LGES signs $4.3 billion BESS cell supply deal with Tesla","lges-signs-4-3-billion-bess-cell-supply-deal-with-tesla","article/lges-signs-4-3-billion-bess-cell-supply-deal-with-tesla",{"_uid":1175,"date":1176,"tags":1177,"editor":1192,"content":1196,"excerpt":1288,"featured":51,"reporter":1289,"component":710,"seo_title":1171,"categories":1293,"visibility":1036,"data_vis_image":1298,"featured_image":1300,"seo_description":1288,"formattedDate":1304},"d6448cee-d13f-41fb-ada8-986ba802389d","2026-03-24 00:00",[1178,1179,1182,1185,1187,1190,1191],{"slug":1058,"name":558},{"slug":1180,"name":1181},"tesla","Tesla",{"slug":1183,"name":1184},"lges","LGES",{"slug":1186,"name":451},"lfp",{"slug":1188,"name":1189},"ira","IRA",{"slug":1060,"name":1061},{"slug":742,"name":743},[1193],{"slug":589,"name":590,"content":1194},{"job_title":592,"image":1195,"bio":595,"linkedin":596},{"filename":594},{"type":598,"content":1197},[1198,1210,1215,1222,1227,1249,1254,1261,1266,1273,1278,1283],{"type":601,"attrs":1199,"content":1200},{"textAlign":49},[1201,1203,1209],{"text":1202,"type":606},"The US Department of the Interior (DOI) announced last week that South Korean battery manufacturer LG Energy Solution (LGES) has secured a US$4.3 billion battery electric stationary storage (BESS) cell supply agreement with ",{"text":1181,"type":606,"marks":1204},[1205],{"type":611,"attrs":1206},{"href":1207,"uuid":1208,"anchor":49,"target":615,"linktype":616},"/article/tesla-to-discontinue-the-model-s-and-x-as-it-pivots-towards-humanoid-robots","d988206d-9e4d-43bd-8969-21ef3bdb3281",{"text":702,"type":606},{"type":601,"attrs":1211,"content":1212},{"textAlign":49},[1213],{"text":1214,"type":606},"The deal will see LFP prismatic cells manufactured at a facility in Lansing, Michigan, that will begin production from 2027. The cells will be deployed in Tesla’s Megapack 3 system which is to be produced at the company’s Houston megafactory. The deal was first rumoured in the summer of 2025 but has now officially been closed.",{"type":663,"attrs":1216,"content":1217},{"level":665,"textAlign":49},[1218],{"text":1219,"type":606,"marks":1220},"US BESS projects seek to diversify from China",[1221],{"type":674},{"type":601,"attrs":1223,"content":1224},{"textAlign":49},[1225],{"text":1226,"type":606},"Tesla’s cell procurement strategy in the BESS space has so far relied on Chinese expertise. The company’s long-standing partnership with CATL was the bedrock of the Megapack strategy, which has now been diversified to include BYD and EVE Energy.",{"type":601,"attrs":1228,"content":1229},{"textAlign":49},[1230,1232,1239,1241,1248],{"text":1231,"type":606},"There have recently been a range of ",{"text":1233,"type":606,"marks":1234},"legislative changes",[1235],{"type":611,"attrs":1236},{"href":1237,"uuid":1238,"anchor":49,"target":615,"linktype":616},"/article/what-does-the-big-beautiful-bill-mean-for-the-ev-battery-and-critical-minerals","5b7eeeea-766b-4cef-b765-020a7ec8841f",{"text":1240,"type":606}," to the Inflation Reduction Act (IRA) through the One Big Beautiful Bill Act (OBBA) regarding Foreign Entities of Concern (FEOC) compliance and Material Assistance Cost Ratios. As a result, US-based battery producers and system integrators have had to re-align their supply chains to qualify for ",{"text":1242,"type":606,"marks":1243},"48E and 45X tax credits",[1244],{"type":611,"attrs":1245},{"href":1246,"uuid":1247,"anchor":49,"target":615,"linktype":616},"/article/record-ev-sales-in-the-us-as-tax-credit-disappears","759287a8-220f-43f8-a847-3b9d88a135d1",{"text":702,"type":606},{"type":601,"attrs":1250,"content":1251},{"textAlign":49},[1252],{"text":1253,"type":606},"Consequently, those cell manufacturers who have announced US-domestic LFP production capabilities are in high demand as projects look to remain compliant.",{"type":663,"attrs":1255,"content":1256},{"level":665,"textAlign":49},[1257],{"text":1258,"type":606,"marks":1259},"Domestic US cell supply is growing",[1260],{"type":674},{"type":601,"attrs":1262,"content":1263},{"textAlign":49},[1264],{"text":1265,"type":606},"Tesla announced in May 2025 that it was nearing completion of a 10GWh BESS cell production facility at its Nevada site. Utilising CATL-supplied equipment, this facility is currently behind schedule with a reduced production capacity set to come online in 2026.",{"type":653,"attrs":1267},{"id":1268,"body":1269},"6f6c19d6-1ac5-492b-ac52-188fc823fb6a",[1270],{"id":1271,"_uid":1272,"type":660,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"28206172","i-2f9b9ee4-30eb-4728-ab4e-e6bf9711983f",{"type":601,"attrs":1274,"content":1275},{"textAlign":49},[1276],{"text":1277,"type":606},"With the swathe of newly announced LFP capacity coming online in the US, including EV players converting lines to BESS-specific LFP cell production, more readily available domestic cell supply is becoming available at scale. Such players include LGES, Samsung, and even completely new entrants to the energy storage market such as Ford, which has announced 20GWh of BESS cell capacity to come online by 2027.",{"type":601,"attrs":1279,"content":1280},{"textAlign":49},[1281],{"text":1282,"type":606},"The Houston megafactory is planned to begin production in 2026, with the latest Megapack 3 and the MegaBlock to be produced at the facility. The company’s current nameplate BESS system production capacity sits at around 80GWh per year across Lathrop and Shanghai facilities. This will be expanded to 130GWh in nameplate capacity with the completion of the Houston facility adding up to 50GWh, although initial production in 2026 will be considerably less with a ramping period.",{"type":601,"attrs":1284,"content":1285},{"textAlign":49},[1286],{"text":1287,"type":606},"In its latest investor report, Tesla reported 14.2GWh of deployed energy storage capacity in Q4, bringing the yearly total to 46.7GWh, a year-on-year increase of just under 50%.","The US Department of the Interior (DOI) announced last week that South Korean battery manufacturer LG Energy Solution (LGES) has secured a US$4.3 billion battery electric stationary storage (BESS) cell supply agreement with Tesla.",[1290],{"slug":544,"name":543,"content":1291},{"job_title":557,"image":1292,"bio":548,"linkedin":555,"markets_covered":558},{"filename":552},[1294,1295],{"slug":714,"name":715},{"slug":1296,"name":1297},"gigafactories","Battery & Gigafactory",{"id":49,"alt":49,"name":547,"focus":49,"title":49,"source":49,"filename":547,"copyright":49,"fieldtype":553,"meta_data":1299},{},{"id":1301,"alt":547,"name":547,"focus":547,"title":547,"source":547,"filename":1302,"copyright":547,"fieldtype":553,"meta_data":1303,"is_external_url":50},129073103685289,"https://a.storyblok.com/f/287943243085208/2993b6fc5b/bm-tesla-gigafactory-4-dji-0336.jpg",{},"Mar 24, 2026",{"id":1306,"uuid":1307,"name":1308,"slug":1309,"full_slug":1310,"content":1311},148469425506967,"8a3561ee-39d5-443e-abf1-4148319e3650","Battery manufacturers ramp up cell size to meet growing BESS capacity demands","battery-manufacturers-ramp-up-cell-size-to-meet-growing-bess-capacity-demands","article/battery-manufacturers-ramp-up-cell-size-to-meet-growing-bess-capacity-demands",{"_uid":1312,"date":1313,"tags":1314,"editor":1325,"content":1329,"excerpt":1466,"featured":51,"reporter":1467,"component":710,"seo_title":1471,"categories":1472,"visibility":1036,"data_vis_image":1478,"featured_image":1480,"seo_description":1485,"formattedDate":1486},"a5ab5841-48a2-4169-af74-f1e572e61653","2026-02-24 00:00",[1315,1316,1319,1322],{"slug":1058,"name":558},{"slug":1317,"name":1318},"bess-systems","BESS Systems",{"slug":1320,"name":1321},"energy-storage","Energy storage",{"slug":1323,"name":1324},"eve-energy","EVE Energy",[1326],{"slug":589,"name":590,"content":1327},{"job_title":592,"image":1328,"bio":595,"linkedin":596},{"filename":594},{"type":598,"content":1330},[1331,1349,1361,1373,1380,1394,1399,1420,1427,1434,1448,1460],{"type":601,"attrs":1332,"content":1333},{"textAlign":49},[1334,1336,1341,1343,1347],{"text":1335,"type":606},"Earlier this month, Chinese OEM EVE Energy announced that ",{"text":1337,"type":606,"marks":1338}," ",[1339],{"type":671,"attrs":1340},{"color":547},{"text":1342,"type":606},"the world’s first 100MWh-class battery energy storage system (BESS) grid-side project – Ruite New Energy Lingshou BESS – ",{"text":1337,"type":606,"marks":1344},[1345],{"type":671,"attrs":1346},{"color":547},{"text":1348,"type":606},"utilising 628Ah cells has officially entered operation.",{"type":601,"attrs":1350,"content":1351},{"textAlign":49},[1352,1354,1359],{"text":1353,"type":606},"The project ",{"text":1355,"type":606,"marks":1356},"includes 80 Mr. Giant storage systems using EVE Energy’s self-produced Mr. Big 628Ah cell and 40 integrated converter cabins, using 5MWh containers. The commission of this project ",[1357],{"type":671,"attrs":1358},{"color":547},{"text":1360,"type":606},"reflects a trend of increasing cell capacity driven by ambitions to cut land usage at 100MWh-scale sites.",{"type":601,"attrs":1362,"content":1363},{"textAlign":49},[1364,1366,1371],{"text":1365,"type":606},"Over the last two years, BESS integrators have ramped up development of larger cells ",{"text":1367,"type":606,"marks":1368},"alongside other strategies",[1369],{"type":611,"attrs":1370},{"href":801,"uuid":802,"anchor":49,"target":771,"linktype":616},{"text":1372,"type":606}," for increased capacity, including larger containers and stacked modules.",{"type":663,"attrs":1374,"content":1375},{"level":665,"textAlign":49},[1376],{"text":1377,"type":606,"marks":1378},"The drive for size",[1379],{"type":674},{"type":601,"attrs":1381,"content":1382},{"textAlign":49},[1383,1385,1392],{"text":1384,"type":606},"As well as shrinking the physical footprint of BESS facilities, ",{"text":1386,"type":606,"marks":1387},"integrators and manufacturers",[1388],{"type":611,"attrs":1389},{"href":1390,"uuid":1391,"anchor":49,"target":771,"linktype":616},"/article/bess-system-integrator-ranking-in-h1-2025-shows-change-is-on-the-horizon-for-the-industry","b3df4ba0-52b6-469b-9695-870f7eb68178",{"text":1393,"type":606}," hope that larger cells will help to reduce manufacturing complexity. This reduction could in turn mean more reliable supply chains, with fewer parts required, and diminished cooling and wiring requirements.",{"type":601,"attrs":1395,"content":1396},{"textAlign":49},[1397],{"text":1398,"type":606},"More fundamentally, the increase in capacity within a single container would allow for higher energy density projects. Over the last five years, there has been a push for greater energy density in new BESS installations, with the typical 20ft container in 2022 at ~4MWh, compared to today's industry standard of 5-6MWh+.",{"type":601,"attrs":1400,"content":1401},{"textAlign":49},[1402,1403,1410,1412,1419],{"text":763,"type":606},{"text":1404,"type":606,"marks":1405},"rapid expansion globally",[1406],{"type":611,"attrs":1407},{"href":1408,"uuid":1409,"anchor":49,"target":771,"linktype":616},"/article/global-bess-installments-increase-29-y-o-y","97c1dbbb-810f-4732-bbc5-3300ed5257d0",{"text":1411,"type":606}," in the average project size of new installations has been driven in large part ",{"text":1413,"type":606,"marks":1414},"by those in the Middle East",[1415],{"type":611,"attrs":1416},{"href":1417,"uuid":1418,"anchor":49,"target":771,"linktype":616},"/article/saudis-bisha-battery-energy-storage-project-uses-30000-evs-worth-of-battery-minerals","a1c5b447-2917-45e6-832c-cc9c3e0dc267",{"text":702,"type":606},{"type":653,"attrs":1421},{"id":1422,"body":1423},"f30dfbe1-f535-4ce5-8399-9e78d5784450",[1424],{"id":1425,"_uid":1426,"type":660,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"27759217","i-0b0b45d1-1dff-4799-8f18-c65462894dbb",{"type":663,"attrs":1428,"content":1429},{"level":665,"textAlign":49},[1430],{"text":1431,"type":606,"marks":1432},"The major players",[1433],{"type":674},{"type":601,"attrs":1435,"content":1436},{"textAlign":49},[1437,1439,1446],{"text":1438,"type":606},"It is not only EVE Energy that has been driving development of larger cells. In January, ",{"text":1440,"type":606,"marks":1441},"BYD showcased the world’s largest mass-produced cell",[1442],{"type":611,"attrs":1443},{"href":1444,"uuid":1445,"anchor":49,"target":771,"linktype":616},"/article/byd-unveils-2710ah-cell-for-new-haohan-storage-system","cdfb52b5-8b42-48e6-a60f-c26ddc4c2f05",{"text":1447,"type":606},", which comes in at a capacity of 2,710Ah.",{"type":601,"attrs":1449,"content":1450},{"textAlign":49},[1451,1458],{"text":1452,"type":606,"marks":1453},"Leading firms in the space",[1454],{"type":611,"attrs":1455},{"href":1456,"uuid":1457,"anchor":49,"target":771,"linktype":616},"/article/who-were-the-top-cell-suppliers-in-the-bess-market-in-h1-2025","856c6f80-c683-4faf-95f5-f1b762deeac3",{"text":1459,"type":606}," already have a range of larger cells in production, with HiTHIUM, Sunwoda, Great Power, Envision AESC and REPT Battero already manufacturing cells between 530Ah and 684Ah. That range reflects the lack of a standardised ‘larger’ cell size so far within the industry.",{"type":653,"attrs":1461},{"id":1422,"body":1462},[1463],{"id":1464,"_uid":1465,"type":660,"component":661,"fixed_height":547,"use_fixed_height":50,"fixed_height_mobile":547,"fixed_height_tablet":547},"27773684","i-c6fc5e10-9bf3-479c-a3b6-b62a2748a979","Earlier this month, Chinese OEM EVE Energy announced that  the world’s first 100MWh-class battery energy storage system (BESS) grid-side project – Ruite New Energy Lingshou BESS –  utilising 628Ah cells has officially entered operation.",[1468],{"slug":544,"name":543,"content":1469},{"job_title":557,"image":1470,"bio":548,"linkedin":555,"markets_covered":558},{"filename":552},"Battery makers increasing cell size to meet BESS capacity demands",[1473,1476,1477],{"slug":1474,"name":1475},"battery-technology","Battery Technology",{"slug":1296,"name":1297},{"slug":714,"name":715},{"id":49,"alt":49,"name":547,"focus":49,"title":49,"source":49,"filename":547,"copyright":49,"fieldtype":553,"meta_data":1479},{},{"id":1481,"alt":547,"name":547,"focus":547,"title":1482,"source":547,"filename":1483,"copyright":547,"fieldtype":553,"meta_data":1484,"is_external_url":50},148505290302439,"Image credit: EVE Energy","https://a.storyblok.com/f/287943243085208/2700x1800/4aa18421e8/eve-energy.jpeg",{"alt":547,"title":1482,"source":547,"copyright":547},"Earlier this month, Chinese OEM EVE Energy announced that  the world’s first 100MWh-class battery energy storage system (BESS) grid-side project – Ruite New Energy Lingshou BESS –  utilising 628Ah cells has officially entered operation. ","Feb 24, 2026",1784908444495]